Eglin Air Force Base
96th CES
Award: 03/20/2019 Completed: 03/20/2020
$1,807,008
FA2823-19-C-A-022
Prepared the site, installed site utilities and performed site improvements to prepare for the building construction for a large medical building to be built by a private contractor.
Project included permitting, clearing, grubbing the job site, grading, constructing site drainage pond and structures, installing all underground utilities and compacting the building footprint.
Also included was the installation of 74 space asphalt parking lot, curbing and sidewalks.
We provided temporary power usage during construction, and installed the permanent utility connections (water/wastewater/electricity/ natural gas/communications lines), grass/landscaping/irrigation system, sidewalks, all parking area lighting and lockable bollards.
Project completed three weeks early
Eglin Air Force Base
96th CES
Award: 08/21/2019 Completed: 05/31/2021
$1,750,625
FA2823-19-C-A064
General renovation of Eglin AFB Building -
One of about 25 historic buildings in the Eglin Field National Historical District which has a period of significance of 1925-1949 when it was an air facility
Building houses secure training and remained in operation throughout the renovation
Project included demolition, new walls, ceiling and infrastructure
Eglin Air Force Base
96th CES
Award: 03/29/2021 Completed: 09/13/2022
$2,261,128
FA2823-20-C-0053
General renovation of Eglin AFB Building, one of 25 historic buildings in the Eglin Field National Historical District, which has a period of significance of 1925-1949 when it was a small Air Facility
Work includes removal of existing exterior/ interior and structural components, mechanical system components, electrical and communications components, finishes, ceilings, walls, doors, associated hardware and the installation of upgrade components, plus furniture, fixtures and equipment
This building had been renovated many times and had layers of wall material. Many structure supports were badly compromised or missing, crumbling plaster from original part of the building unable to hold door frames, original brittle masonry around windows preventing proper installation of new windows, layers of failing roofing allowing water intrusion, and many other issues
Eglin Air Force Base
96th CES
Award: 09/17/2020 Completed: Ongoing
$2,206,252.33
FA2823-20-C-0050
Designed and constructed the expansion of secure areas. This project required the removal of two existing walls to provide sufficient workspace for the 28 Test and Evaluation Squadron, meeting all current versions of ICD 705 version 1.3 and DoDM 5205.07 Volume 3
Project included complete construction estimate, site plan, floor plans and elevations
Project brings the security requirements to meet the standards necessary to execute the mission
Eglin Air Force Base
96th CES
Award: 10/20/2017 Completed: 08/04/2022
$3,847,226 over 5 years
FA2823-17-D-4003
Asbestos, lead paint and mold surveys, sampling, testing and remediation
Copyright © 2024 Yerkes South Inc - All Rights Reserved.